We are searching forward to developing productive organization interactions with new customers around the world in the long term. We also can design and make non-standard items to meet up with customers’ particular specifications. Good quality and credit are the bases that make a company alive. one period Functions colon
ast Shangchai Caterpillar tech SC11CB220G2B1 motor is adopted comma huge torque backup and strong EPT period
ast One stage comma four aspects comma twin turbo ZL50 torque converter and planetary EPT from HangEPT Progress EPT Team comma compact structure and high reliability period
ast Equipment-shift with 2 EPT and 1 reverse controlled by fleXiHu (West Lake) Dis.ble shaft eases a lot labor period
ast Strengthened axles owning large bearing capacities and substantial dependability period of time
ast Twin pump merging EPT program makes reduce intake and superb overall performance period of time
ast The coaxes flow-amplified comma EPT compensated steering makes operation straightforward and efficiency reputable interval
ast Both vacation technique and working EPT system are compelled-cooled comma improving the efficiency clearly period
ast Air over EPT brake technique semi eigEPT caliper disc brakes period
ast Air split handle comma expand hoof kind parking brake and crisis brake period of time
ast Functioning unit with automatically leveling capacity at large position period of time
ast Bucket articulated details take sealed comma lubricated comma dust-evidence layers comma which owns very good sturdiness period
ast Integral comma luxury instrument board interval
ast EPT comma luxurious cabin
two periodMain Requirements colon
Merchandise | Specification | Product | Specification |
Bucket capacity | 3m sup3 | Min time period turning radius lparoutside of rear wheel rpar | 6360mm |
Rated load | 5000kg | Steering angle | 35 deg |
Dumping height | 3100mm | Min interval ground clearance | 478mm |
Dumping get to | 1285mm | Wheel base | 3200mm |
EPT lifting time | 6 period8s | Wheel tread | 2250mm |
Max period of time pace | 36km solh | Rated EPT | 162kW sol2200rpm |
Max period of time breakout drive | 170kN | Tyre | 23 period5-twenty five |
Max time period drawing pressure | 150kN | Overall dimensions | 7960 ast3070 ast3490mm |
Max period of time grade capacity | 28 deg | Operating bodyweight | 17000kg |
Remark colon EPT chassis for stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd
three interval EPT certificate colon
lpar1 rpar CE Accepted period of time
lpar2 rpar Obtained the certificate of ISO9001 colon2008 period of time
lpar3 rpar EPT license quantity colon TS2510571-2009 interval